ON GOING PROJECTS:

  • Design and Construct New Orbital Highway and Truck Route (P023) Contact 3 (Leighton-Al Jaber)

  • Roads and Infrastructure in Rawdat Abal Heeran (DW015 Package 1) - (QBS)

  • Roads & Infrastructure in Al Kheesa North & East (Joint Venture (CGC-SACYR)

  • Grading and Temporary Roads for the New Temporary Labor Accommodation Package 1,2,3 (Solid General)

  • Roads and Infrastructure in North of Mall of Qatar & Celebration Road-Advance Grading Works - (BOTC)

  • RIW in northern Areas - (Al Tawfeeq & Partners Contracting)

  • Roads & Infrastructure in Al Themaid and Rawdat Egdaim - (Solid General)

  • Roads & Infrastructure in Bani Hajer North, Phase 1 & Package-02            (HBK Contracting)

  • Flow Diversion Schemes in Al Wajba & New Al Rayyan - (BOTC)

  • Roads & Infrastructure in West of Al Meshaf Package 3 - (BOTC)

  • Bypass from Rawdat Rashed Village to Umm Garn package 2 - (BOTC)

  • Road Improvement works for junctions and round abouts in various areas of greater Doha, Phase-6 (Buzwair Engineering & Contracting)

  • Extension of Arab League Street to Temporary Truck Route - (QBS International)

  • Construction of Access Road into Wakrah Station 37- LBV - 3

  • Construction of Access Road in Al Khor

  • Barwa Al Khor Site Grading Works

  • Doha West Sewage Treatment Works Extension No. 3  Road Works

  • GTC 115 Extension of Distribution Network in Developed Areas

  • GTC 229 / 2008 Extension of Distribution Network at Doha Vicinity Phase 2

  • GTC 127 Provision of Water Network at Doha and South Qatar Areas  Phase 1

  • Repairing and Widening of Read Near DR-1

  • RIW in Muither West Area

  • Qatar Gas 3 & 4 Development Project LNG Onshore for Utilities and Offsite Areas

  • Resurfacing of Unpaved Areas at Doha International Airport

  • New Arrival Terminal Parking at Doha International Airport

  • Resurfacing of Asphalt Paving on the Driveways and Unpaved Surfaces at Doha International Airport

  • Resurfacing / Repairing of Road 1st R/A to 2nd R/A in Messaieed 

  • RM 1081 Emergency Path Works

  • Rehabilitation Work of Section of C-Ring Road

  • L-Shape and Main Gate Phase 1A

  • Qatar Academy 2 at Al Khor

  • Ministry of AWQAF - Mosque No. 94

  • CP - 15 New Doha International Airport

  • Asphalt Paving Work for Q3 & Q4 Shutdown & Lay down Area

  • RM 1083 / Road Maintenance in Doha Municipality

  • CLSCSEF Greenfield Tank Farm, Dolphin Project Ras Laffan

  • Proposed G+1+P34 Villas Compound & Ancillary Building

  • Police Station and Service Block at Messaimeer

  • Messaieed AIPP Urbanization Work

  • Bar Quenching System

  • C 2009 / 23 Road Maintenance Work in Doha Municipality

  • Communication Complex at Murrah

  • Dukhan Houising Project Phase 4

  • Mowasalat Staff Accomodation Package II - Road Works and Road Marking

  • P94 NDIA Operational Facility Program in Doha, Qatar

  • Car Parking at Administration Building Premises

  • Rectification of Salwa International Highway

  • 22 nd Feb. St. & Al Amir St. Upgarding and Interchange

  • GTC 155 Provision of Water Network at Doha North Qatar Areas 

  • 18.0" Multi Product Pipeline

  • QP GCO9103600 Road Works at Various Locations within Gas Operation Areas

  • QP Ras Laffan Contract No. GC 08100100

  • Concept Design for Roads / Infrastructure Phase 1 Package 6

  • Concept Design for Roads / infrastructure Phase 1 Package 1 Al Wakrah Main Road

  • Concept Design for Roads / Infrastructure Phase 1 Variation 2 Package 2A Al Khor Expressway Pavement Inspection Plan 

  • GTC 229 / 2008 Extension of Distribution Network at Doha Vicinity Area Phase II

  • GTC 305 / 2009 Replacement of Primary and Distribution Network at Doha Vicinity Phase III

  • GTC 346 / 2010 Extension of Distribution Network at Doha & Vicinity Phase IV Package 1

  • Additional QAPCO Land Lease (QAPCO PLANT) Job #1011

  • QTR - CNT - 2011 - 1758 - Variation Const. Dia Cargo Terminal New Six Bay East Apron Upgrade Works - Qatar Airways

96fa9bc6-bb60-42ce-a169-ecaa656d55ef.JPG
DSC_2307.jpg

PROJECTS COMPLETED:

  • Roads & Infrastructure in Doha Industrial Area Package-6 (QS001-P06) -(L&T/ASTC-JV)

  • DN117-P01 Bani Hajer Package-1 - (Bin Omran Trading & Contracting)

  • Roads and Infrastructure in West of Al Mashaf Package-4 - (Bin Omran Trading & Contracting)

  • Infrastructure FS GAPS for Al Kheesa Package-01, 03, 05 (Bin Omran Trading and Contracting)

  • Transmission  Pipelines for Mega Reservoirs GTC611/2013 - (CAT-Boom JV)

  •  GTC/644A/2014 Phase-6 Package-A - (Boom Construction Co.)

  • Construction of Additional Pipe Line (GTC644/2014AV01) (Boom Construction Co.)

  • Different Projects - HABA

  • Kid’s Majlis/Ain Khalid Private Palace - (AMTC)

  • Taskeel Factory - Janas Contracting

  • Development of Link Road from Barwa Commercial Road to Wakrah Main Road – Advanced Temporary Works – DS136-P04 (IA 2016 C 034G) - (Boom Construction Co.)

  • High Campus and HBKMC MHC/DP/2373863/18 - (Boom Construction Co.)

  • Al Khor Expressway Project 1 - (Boom Construction Co.)

  • Roads & Infrastructure in Shamal-Package 01 - (Bin Omran Trading & Contracting)

  • Design & Construct New Orbital Highway and Truck Route P023: Contract 2 Salwa Road to North Relief Road - (Bin Omran Trading & Contracting)

  • Design Built & Maintenance of Link Road Between Al Khor & Ras Mulaiji - (Bin Omran Trading & Contracting)

  • QS042-Link Road & Infrastructure to Salwa Beach Resort - (Bin Omran Trading & Contracting. 

  • Construction of Khalifa Street and TV Round About Upgrade - (Boom Construction Co.)

7bf7b4ac-9e05-468b-8b36-0c7dbdd407a5.JPG
da3ee123-d7ab-4156-959f-06f26428714b.JPG
87e6d011-e27e-4d5d-880b-366e7a6a3323.JPG
20140131_141042_1.jpg
  • Roads & Infrastructure (DN108-P02) North of Al Nassriya - (Boom Construction Co.)

  • Roads & Infrastructure in Doha Industrial Area-Package-4 (QS-001) P04 - (Boom Lotus-JV)

  • Al Wakrah Families Housing (Urbacon Trading & Contracting)

  • Labor Accommodation Wakra (Urbacon Trading & Contracting)

  • P029 C1 – Construction of al Khufoos Street - (Boom Construction Co.)

  • C2018/053- Improvement of Interim A-Ring Road Scheme - (Boom Construction Co.)

  • A Ring Road Interim Improvement Scheme (Boom Construction Co.)

  • IA-2018-C080-G J1904-RIW for Junctions & Roundabouts in Various Areas of Greater Doha Phase 8 - (Boom Construction Co.)

  • Roads and Infrastructure in Al Sailiya/Al Attiya (Qatar Building Company)

  • Central Doha and Corniche Beautification (Boom Construction Company)

  • Zonal Framework Contract for Maintenance C2018/90 - (Boom Construction Co.)

  • DW080-Road and Infrastructure in Sailiya, Alatiya - (Qatar Building Company)

  • Upgrade of Al Wakrah Main Road P017-C1-IN) - (Boom Construction Co.)

  • P-007-C-5 P1 Al Bustan Street South (Boom Construction Co.)

  • Zonal Framework Contract for Road Maintenance Qatar Doha South Area 1 and 2-ZF-019 (Boom Construction Company)

  • Construction of Foul Sewer Network P-03 C816/3B) (Lotus Trading & Contracting)

  • RIW in Rayyan Areas Phase 5A (Boom Construction Co)

  • Construction of Sewage Pumping Station C818 (Metito Overseas Qatar)

  • D & B Contract for Wukair PP-PS Pumping Station (Metito Overseas Qatar)

  • Roads and Infrastructure in Mubaireek Zone 81 P01 (Boom Construction Company)

  • Construction of Flood Prevention Scheme (Boom Construction Company)